Free fire door inspection checklist template
A fire door inspection checklist records the routine checks made on each fire door in a building and what needs fixing. Building managers, caretakers and maintenance teams use one to show the doors are being looked at and faults are followed up. This template has one row for each door, with its location and rating, a yes or no for each check, an overall result and the action needed.
Free to use and change. No sign up and no email address needed.
What this template is not. This checklist records routine visual checks. It does not replace your fire risk assessment, or a detailed inspection by a competent fire door inspector.
The fire door inspection checklist template
| Door ID | Location | Rating | Label or plug present | Leaf and frame sound | Gaps even | Seals intact | Hinges secure | Closes and latches | Glazing sound | Result | Action needed |
|---|---|---|---|---|---|---|---|---|---|---|---|
| FD-G01 | Ground floor, lobby to stair A | FD30S | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Pass | |
| FD-G02 | Ground floor, corridor to plant room | FD60S | Yes | Yes | Yes | No | Yes | Yes | N/A | Fail | Smoke seal missing on hinge side. Job J-20951 |
| FD-101 | First floor, stair A to corridor | FD30S | Yes | Yes | No | Yes | Yes | No | Yes | Fail | Door drops and catches on frame. Does not latch. Job J-20952 |
| FD-102 | First floor, riser cupboard | FD30 | Yes | Yes | Yes | Yes | Yes | N/A | N/A | Pass | Kept locked shut, no closer fitted |
| FD-103 | First floor, kitchen | Not found | No | Yes | Yes | Yes | Yes | Yes | N/A | Fail | No label or plug. Refer to fire door inspector |
| FD-201 | Second floor, stair A to corridor | FD30S | Yes | No | Yes | Yes | Yes | Yes | Yes | Fail | Hole in leaf from old lock. Job J-20953 |
| FD-202 | Second floor, stair B to corridor | FD30S | Yes | Yes | Yes | Yes | No | Yes | Yes | Fail | Two screws missing from top hinge. Fixed on the day |
| FD-203 | Second floor, store room | FD30 | Yes | Yes | Yes | Yes | Yes | Yes | N/A | Pass |
What each column is for
- Door ID
- Your own reference for the door. Put the same ID on a small label on the hinge edge.
- Location
- The floor and what the door leads to.
- Rating
- The fire rating shown on the door's label or plug, such as FD30S. Write Not found if there is none.
- Label or plug present
- Yes if the door carries a certification label or plug.
- Leaf and frame sound
- Yes if the door and frame have no holes, splits or damage.
- Gaps even
- Yes if the gaps between door and frame are even and within what the door's certification allows.
- Seals intact
- Yes if the intumescent strips and smoke seals are in place, continuous and not painted over.
- Hinges secure
- Yes if the hinges are firmly fixed with no missing or loose screws.
- Closes and latches
- Yes if the closer shuts the door fully into the frame by itself from any angle.
- Glazing sound
- Yes if any glass is intact and its beading is secure. Write N/A if there is no glass.
- Result
- Pass, or Fail if any check is a No.
- Action needed
- What must be fixed, and the job reference once you have raised it.
How to use it
- List every fire door. Use your fire risk assessment or the building's fire strategy drawings to find them. Give each door an ID and a row.
- Write the date and your name on the sheet. Use a new sheet, or a new copy of the spreadsheet, for each round of checks.
- Check each door in the same order. Open it fully, let it go, and watch it close. Then look at the leaf, frame, gaps, seals, hinges and any glass.
- Mark the result. Any No makes the door a Fail. Write what is wrong in the Action needed column.
- Raise a job for every fail. Repairs to a fire door should be done by someone competent, with parts that suit the door's certification. Note the job reference on the sheet.
Use the live version
The checks only help if the next round happens and the fails get fixed. In OmniSchema Operations the round is a planned task and each fail can be a job.
- Mark a task done and the next due date is worked out for you.
- An Overdue page shows what is late today, so nothing hides in a filter.
- On the paid plans the PPM planner raises a job before each visit is due and gives it to the engineer.
- Engineers complete the visit steps on their phone, even with no signal, and the history keeps who did what.
OmniSchema Operations has a free plan with no card needed. See pricing.
Questions people ask
How often should fire doors be checked?
In England, the Fire Safety (England) Regulations 2022 require the responsible person for a block of flats over 11 metres high to check fire doors in the communal areas at least every three months, and to make best endeavours to check flat entrance doors at least every 12 months. For other buildings, use the interval your fire risk assessment sets.
Who can carry out these checks?
Routine visual checks like these can be made by a trained caretaker or building manager. A door that fails, or has no label, should be looked at by a competent fire door inspector or installer.
What should a fire door inspection checklist cover?
The certification label, the leaf and frame, the gaps, the intumescent strips and smoke seals, the hinges, the closer and latch, and any glazing. This template has a column for each.
What do FD30 and FD30S mean?
FD30 is a door tested to resist fire for 30 minutes, and FD60 for 60 minutes. The S means it also has smoke seals. Take the rating from the door's label, plug or paperwork, not from how it looks.
What do I do if a fire door fails?
Record the fault, raise a repair and keep the door closed in the meantime. Tell whoever is responsible for fire safety in the building, as the fire risk assessment may need to take it into account.
Related templates
All free templates · Remedial works tracking: Turn what an inspection found into actions and jobs