Free permit to work template
A permit to work is a signed form that allows one named job to go ahead for a set time, once the hazards and precautions have been agreed. Site and facilities managers issue one to contractors for higher risk work, such as hot work, work at height or work on live services. This template has boxes for the work and its location, the hazards, the precautions and isolations, who issued and accepted the permit, and the hand back at the end.
Free to use and change. No sign up and no email address needed.
What this template is not. This form is a starting layout. It does not replace your own risk assessment, your site rules or a permit to work system designed for your site by a competent person, and it is not suitable as it stands for high hazard work such as confined spaces.
The permit to work template
| Field | Entry |
|---|---|
| Permit number | PTW-0087 |
| Kind of work | Hot work |
| Site and exact location | Example Court, roof plant deck, pipework beside AHU1 |
| Description of the work | Cut out and braze in a new section of 28mm copper chilled water pipe. |
| Company and person in charge | Example Mechanical, Sam P. |
| Valid from | 24/11/2026, 09:00 |
| Valid until | 24/11/2026, 15:00 |
| Risk assessment and method statement | RAMS-0231, version 2 |
| Hazards | Naked flame near roof membrane and stored filters. Hot pipework. Fumes. |
| Precautions | Clear area for 10m. Fire blanket under joint. Two extinguishers at the work. Barriers and signs. |
| Isolations | Chilled water isolated at valves V12 and V13, drained. Lock 4, key with issuer. |
| Protective equipment | Gloves, eye protection, flame resistant overalls |
| Fire watch and checks after work | Fire watch: Tom H. Area checked after work as set in site rules. |
| Emergency arrangements | Call point at roof door. Assemble in front car park. |
| Issued by | Priya S., 24/11/2026, 08:50 |
| Accepted by | Sam P., 24/11/2026, 08:55 |
| Hand back | Work complete. Area clear. Sam P., 14:10 |
| Permit cancelled | Isolations removed, system refilled. Priya S., 15:20 |
What each field is for
- Permit number
- A running number from your permit register.
- Kind of work
- The category your site uses, such as hot work, work at height or electrical work.
- Site and exact location
- The building, floor and area the permit covers. Work anywhere else is not covered.
- Description of the work
- What will be done, and with what tools.
- Company and person in charge
- The firm doing the work and the named individual responsible for it on the day.
- Valid from
- The date and time work may start.
- Valid until
- The date and time the permit ends. Keep it to one shift.
- Risk assessment and method statement
- The reference of the RAMS reviewed for this job.
- Hazards
- What could cause harm in this job, in this place.
- Precautions
- What must be in place before and during the work.
- Isolations
- Which services are isolated, how, and who holds the key or lock.
- Protective equipment
- What must be worn.
- Fire watch and checks after work
- For hot work: who watches during the work, and for how long the area is checked afterwards under your site rules and insurer's conditions.
- Emergency arrangements
- How to raise the alarm, and where the nearest call point and exit are.
- Issued by
- Name, signature, date and time of whoever authorised the work.
- Accepted by
- Name, signature, date and time of the person in charge, confirming they understand the precautions.
- Hand back
- The person in charge signs that the work is complete or stopped, and the area is left safe.
- Permit cancelled
- The issuer signs that the area has been checked, isolations removed and the permit closed.
How to use it
- Decide which work needs a permit. List the kinds of work on your site that need one, and who is allowed to issue them. Put the list where contractors will see it.
- Review the paperwork first. Read the contractor's risk assessment and method statement before the day, and write its reference on the permit.
- Fill it in at the place of work. Walk to the area with the person in charge. Agree the hazards, precautions and isolations there, not in the office.
- Sign, and display it. Issuer and person in charge both sign. Keep a copy at the work and one in your permit register.
- Hand back and cancel. At the end, the person in charge hands the permit back. The issuer checks the area, removes isolations and cancels it.
Use the live version
OmniSchema Operations is not a permit to work system, but it does put a safety check in front of every job: the engineer cannot start until they have gone through it.
- Engineers see their own jobs for the day on their phone and close them without ringing the office.
- A safety check before the job starts, and your own close out questions, photos and notes before it ends.
- It keeps working with no signal and sends everything when the phone is back online.
- On the paid plans each closed job has a job sheet PDF, with the customer's signature if you ask for one.
OmniSchema Operations has a free plan with no card needed. See pricing.
Questions people ask
What is a permit to work?
It is a formal, signed record that a higher risk job has been thought through, that the precautions are in place, and that named people have authorised and accepted the work for a set time.
When is a permit to work needed?
Your own risk assessment and site rules decide. It is commonly used for hot work, work at height, work on electrical or pressurised systems, and entry into confined spaces.
Who can issue a permit to work?
Someone your organisation has authorised, who knows the site and its hazards and is competent to judge the precautions. It should not be the same individual who accepts it.
How long should a permit last?
Keep it short, usually no longer than one shift, and issue a new one if the work carries on. A permit should never be left open.
Where can I read official guidance?
HSE publishes guidance on permit to work systems, HSG250. It explains how a system should be designed and run, which goes beyond the form itself.
Related templates
All free templates · Job management software: Jobs, engineers, job sheets and invoices for maintenance contractors