OmniSchema
Free template

Free van stock checklist template

A van stock checklist is a list of the parts an engineer's van should carry, with how many there should be and how many there are. Plumbing, heating, electrical and maintenance firms use one to restock vans before a part runs out on a job. This template has one row for each part, with where it is kept, the level to hold, the count on the day, and how many to restock.

Download Excel (.xlsx)Download PDF

Free to use and change. No sign up and no email address needed.

The van stock checklist template

Example rows. The sites, firms and names are made up.
PartPart codeKept inUnitLevel to keepCountedRestockUsual supplierNotes
Copper tube 15mm, 3m lengthCT15-3Roof tubeeach642Example Plumbing Supplies
Compression elbow 15mmCE15Bin A1each20119Example Plumbing Supplies
Isolating valve 15mmIV15Bin A2each10100Example Plumbing Supplies
Flexible tap connector 15mm x 1/2 inchFTC15Bin A4each835Example Plumbing Supplies
Fibre washers, assortedFW-ASTBox B2pack422Example Plumbing Supplies
PTFE tape 12mmPTFE12Door pocketeach651Example Plumbing Supplies
Filling loop 15mmFL15Bin C1each303Example Heating SparesLast one used on J-20933
Automatic air vent 1/2 inchAAV12Bin C2each440Example Heating Spares
Silicone sealant, whiteSIL-WShelf 2each413Example Plumbing SuppliesOne tube split, thrown away

What each column is for

Part
What the item is, with its size.
Part code
Your own code or the supplier's, so the right item is reordered.
Kept in
The bin, shelf or box in the van, so anyone can find it.
Unit
What it is counted in: each, metre, box or pack.
Level to keep
How many the van should carry when fully stocked.
Counted
How many are in the van at the check.
Restock
Level to keep minus counted: how many to put back on the van.
Usual supplier
Where you normally buy it.
Notes
Damaged stock, items used on a job but not recorded, or a change to the level.

How to use it

  1. List what the van should carry. Start from the parts your engineers use most. Group them by where they live in the van.
  2. Set a level for each part. Choose how many a fully stocked van should hold. Raise it for parts that often run out.
  3. Count on a set day. Each engineer counts their van on the same day each week and fills in the Counted column.
  4. Restock from the difference. Restock is the level to keep minus the count. Pick those parts from stores or add them to your order.
  5. Look at what keeps running out. If a part is short every week, raise its level. If it never moves, lower it and free up the space.

Use the live version

A weekly count tells you what is missing but not which job it went on. On its paid plans, OmniSchema Operations keeps the count as parts are used.

  • Stock counts, suppliers and reorder levels in one list instead of a sheet in each van.
  • On the paid plans Stock keeps a count for each van and each store.
  • Engineers record the parts they used as they close a job, and the cost goes on that job.
  • Items that fall to their reorder level show under Low stock.
Start free and install itPreview the Inventory Tracker kit

OmniSchema Operations has a free plan with no card needed. See pricing.

Questions people ask

What should a van stock checklist include?

Each part with its size and code, where it is kept, how many the van should carry, the count on the day and how many to restock.

How often should van stock be checked?

Many firms count weekly, on the same day, so the van is full before the busiest part of the week. Count more often if parts keep running out.

How do I decide the level to keep?

Look at what was used over the last few weeks. Hold enough of each common part to cover the time until the next restock, and a little more for the parts that stop a job.

Should every van carry the same stock?

Keep a common core so anyone can cover any van, then add the parts each engineer's kind of work needs.

Does this replace a stock system?

No. It is a counting sheet. It will not tell you which job a part went on or what it cost, which is what a stock system adds.

Related templates

All free templates · Van stock management: Stores and vans, parts used on jobs, and reordering before you run out