A PPM schedule is a list of the planned maintenance each building needs, how often each task is due, and when it was last done. Facilities managers and maintenance contractors use one to make sure servicing and inspections happen on time. This template has one row for each task, with the site, the asset, the frequency, who does it, the last done and next due dates, and a status.

Download Excel (.xlsx)Download PDF

Free to use and change. No sign up and no email address needed.

The PPM schedule template

Example rows. The sites, firms and names are made up.
Site or buildingAsset or systemTaskFrequencyStatutoryDone byLast doneNext dueStatusNotes
Ashby HouseGas boilers, plant roomAnnual service and gas safety check12 monthsYesExample Gas Services14/01/202614/01/2027PlannedPlant room key from reception
Ashby HouseFire alarm systemService visit6 monthsYesExample Fire and Security03/06/202603/12/2026BookedBooked for 02/12/2026, 9am
Ashby HouseEmergency lightingFull duration test12 monthsYesExample Fire and Security21/11/202521/11/2026OverdueChased 18/11/2026
Ashby HousePassenger liftService visit3 monthsNoExample Lifts09/09/202609/12/2026Planned
Example CourtAir handling unit AHU1Filter change and belt check3 monthsNoOwn team: Tom H.30/09/202630/12/2026PlannedFilters in store, shelf 4
Example CourtFixed wiringElectrical installation condition report60 monthsYesExample Electrical17/02/202317/02/2028PlannedReport ref ME 2291
Example CourtRoof and guttersVisual inspection and clear6 monthsNoOwn team: Priya S.12/10/202612/04/2027DoneTwo slipped tiles, job raised
Unit 4, Mill LaneRoller shutter doorsService and safety check12 monthsNoPennywick Doors25/03/202625/03/2027Planned

What each column is for

Site or building
Where the task is done. Use the same name every time so you can filter by it.
Asset or system
The plant, system or area the task covers, such as a boiler, the fire alarm or the roof.
Task
What is done on the visit, in a few words.
Frequency
How often the task is due, in months or weeks.
Statutory
Yes if the task is there to meet a legal duty, so you can see those first.
Done by
The contractor or your own engineer who carries out the task.
Last done
The date the task was last completed.
Next due
The date it is due next: last done plus the frequency.
Status
Planned, Booked, Done or Overdue.
Notes
Access arrangements, the certificate reference, or anything found on the visit.

How to use it

  1. List your sites and assets. Write one row for each task on each asset. Start with the tasks you already pay a contractor for.
  2. Set the frequency. Use the interval in your contract, the maker's instructions or your risk assessment. The intervals in the example rows are examples only.
  3. Fill in last done and next due. Take the last done date from the most recent service sheet or certificate, then add the frequency to get the next due date.
  4. Sort by next due. Each week, sort the sheet by the Next due column and book anything due in the next month.
  5. Update it after every visit. When a task is done, move the date into Last done, work out the new Next due, and note anything that was found.

Use the live version

A spreadsheet only works while someone remembers to open it. The PPM by Building kit in OmniSchema Operations keeps the same schedule as a live list.

  • Mark a task done and the next due date is worked out for you.
  • An Overdue page shows what is late today, so nothing hides in a filter.
  • On the paid plans the PPM planner raises a job before each visit is due and gives it to the engineer.
  • Engineers complete the visit steps on their phone, even with no signal, and the history keeps who did what.
Start free and install itPreview the PPM by Building kit

OmniSchema Operations has a free plan with no card needed. See pricing.

Questions people ask

What does PPM stand for?

PPM stands for planned preventive maintenance. It is the servicing and inspection you plan ahead, as opposed to reactive repairs after something breaks.

What should a PPM schedule include?

At least the site, the asset, the task, how often it is due, who does it, when it was last done and when it is next due. A status column makes late work easy to see.

How often should each task be done?

It depends on the asset and the building. Use the interval in your contract, the maker's instructions and your risk assessments. The intervals in the example rows are examples, not a standard.

Is this template based on SFG20?

No. It is a plain schedule layout with invented example rows. If your contracts are written against SFG20 or a client's own schedules, type those tasks in yourself.

Can I use the PPM schedule in Excel and Google Sheets?

Yes. The download is an ordinary .xlsx file. It opens in Excel, Google Sheets, LibreOffice and Numbers, and you can change any column.